Middle Schools

Saghalie Middle School – Federal Way, WA

Project Type: Remodel
Size: 7,500-ft²
Description: Project includes upgrades of existing science classrooms to house TAF science academy special programs for advanced science and engineering classrooms.

________________________________________________________________________________

Bethel Junior High * ─ Graham, WA

Project Type: New Construction
Size: 75,000-ft²
Description: Project includes ELCCA and Plumbing and HVAC systems for classrooms, kitchen, wood shop, metal shop, science classroom, art rooms and locker rooms. Hydronic heat pump system.
________________________________________________________________________________

Snoqualmie Middle * ─ Snoqualmie, WA

Project Type: Remodel
Size: 60,000-ft²
Description: Project includes ELCCA, Plumbing, HVAC systems for complete remodel and replacement of systems, two pipe hydronic fan coils, gas fired boiler rooms serve three separate classroom pods, band/commons, wood shop/art room, field house and locker room. Administrative and library building also has cooling with dx coils in air handlers.
________________________________________________________________________________

Edgemont Junior High* – Puyallup, WA

Project Type: New Construction
Description: Project includes ELCCA, Plumbing, HVAC systems for new three story building replacing existing school. Hydronic heat pumps service classrooms, science, wood shop, locker rooms. Gymnasiums served by two pipe hydronic heating. Full service kitchen has Type 1 hoods and heat recovery.
________________________________________________________________________________

Columbia Junior High* ─ Fife, WA

Project Type: New Construction
Size: 93,000- ft²
Description: Project includes ELCCA and new systems consisting of four pipe fan coils, served by gas boilers and air cooled chiller. Spaces include auditorium and stage, music, art, science, full cooking kitchen, locker rooms, commons, library, two gyms, weight room and remote filed concessions stand.
________________________________________________________________________________

Rochester Middle* ─ Rochester, WA

Project Type: New building and Gym Remodel
Size: 72,000-ft²
Description: Project includes ELCCA, Plumbing, HVAC systems (four pipe fan coils served by gas boilers and air cooled chiller) for new school and existing gym which was retained for historic preservation. Rooms include classroom wings, warming kitchen, wood shop, art and science classrooms and remodeled locker rooms along existing gym.
________________________________________________________________________________

Olympic Middle* ─ Shelton, WA

Project Type: New Construction
Size: 80,000-ft²
Description: Project includes ELCCA and four pipe fan coil system, gas fired boilers and air cooled chiller, serving commons, stage, music, art, science and home ec programs, full cooking kitchen, locker rooms, two gymnasiums and multi-use/weight room. Hydronic VAV boxes were provided at Administration areas to provide additional zone control
________________________________________________________________________________

Sequoyah Middle* ─Federal Way, WA

Project Type: New Construction
Size: 74,543-ft²
Description: Project includes ELCCA, Plumbing, HVAC systems for new school. Mechanical systems consist of two pipe heating from gas boilers to large central air handlers, one per wing. Classrooms then served by individual VAV boxes to provide zone control .
________________________________________________________________________________

Illahee Middle* ─ Federal Way, WA

Project Type: Remodel
Description: Project includes update to existing wood shop classrooms.

n/a ─ size information not available or not applicable for this project
* Projects performed through other companies