Decatur High – Federal Way, WA

Project Type:  New classroom core with two classroom, conference room and shared kitchen area.  New HVAC and plumbing to support program.

_____________________________________________________________________

 

Wilson High* ─ Tacoma, WA

Project Type: Full mechanical replacement for gym and locker room building, new mechanical for new two story classroom academic building, boiler house replacement with complete new boilers, pumps and piping
Size new academic building: 28,000-ft²
Description: Project includes ELCCA and complete replacement of HVAC systems, systems include new boiler room with five gas boilers.  Larger rooftop air handlers delivered air to gym and locker room.  Pool received new ductwork served by heat recovery unit and dx cooling. Existing ductwork was cleaned and re-supported.  Classroom building has hydronic VAV boxes and culinary kitchen, tv studio and tiered breakout space with in floor hydronic heating.

_____________________________________________________________________

 

Federal Way High* ─ Federal Way, WA

Project Type: Phase 1 and 2 replacement of existing high school with two new wings
Size: 232,000-ft²
Description: Project includes oversight and review of construction, testing and commissioning process on behalf of the school district project management team.

_____________________________________________________________________

Gig Harbor High* ─ Gig Harbor, WA

Project Type: HVAC replacement and controls
Size: 80,000-ft²
Description: Project includes ELCCA and complete replacement of HVAC systems, systems include new boiler room with three gas boilers, and 200 ton air cooled chiller. Larger rooftop air handlers delivered air to hydronic VAV boxes, gym and locker room. Pool received new ductwork served by heat recovery unit and dx cooling. Existing ductwork was cleaned and re-supported. Securing a permit in early spring and pre-review and ordering of air handling units and VAV boxes ensured that the entire project was completed over the summer and except for final controls, the systems were up and running in time for late August registration of classes.
_____________________________________________________________________

Walker High* ─Puyallup, WA

Project Type: HVAC Replacement
Description: Project includes ELCCA and HVAC replacement for existing school. A large dedicated outside air provides pre-filtered air (located near freeway system) to ensure good quality air is delivered to the split system, air-to-air heat pumps located above existing ceilings. An energy grant supplemented the budget.
_____________________________________________________________________

Timberline High* ─ Lacey, WA

Project Type: New Construction and Remodel
Size: 199,185-ft²
Description: Project includes modernization of 80,085 square feet and new addition or 119,100 sq ft. Classroom and new commons are located in two story, three wing building. The existing theater, gym, kitchen and swimming pool were fully remodeled along with locker rooms. A new auxiliary gym was added. Spaces served by new boiler room building and air cooled chiller.

NorthBeach Junior/Senior High * ─ Ocean Shores, WA

Project Type: New Construction
Size: 78,000-ft²
Description: Project includes ELCCA and Plumbing and HVAC systems for classrooms, kitchen, wood shop, metal shop, science classroom, art rooms and locker rooms. Propane gas fired furnace system.
_____________________________________________________________________

Montesano Junior/Senior High * ─ Montesano, WA

Project Type: New Construction
Size: 86,000-ft²
Description: Project includes ELCCA and Plumbing and HVAC systems for classrooms, kitchen, wood shop, metal shop, science classroom, art rooms and locker rooms. Natural gas fired furnace system.
_____________________________________________________________________

Raymond Junior/Senior High* – Raymond, WA

Project Type: New Construction and remodel of existing field house
Description: Project includes ELCCA, Plumbing, HVAC systems for new two story classroom and administration building replacing existing school. Existing gymnasium, stage, locker rooms and district offices were completely remodeled. Large gas fired air handlers, full wood shop with sawdust collector and full cooking kitchen serving the district.
_____________________________________________________________________

Mossy Rock High* ─ Mossy Rock, WA

Project Type: New Science classrooms and remodel of existing
Size: 6,000- ft²
Description: Project includes remodel of two existing classroom and addition of work rooms and new classroom complete with fume hoods, new HVAC, plumbing and acid resistant waste and vent systems.
_____________________________________________________________________

Cascade High* ─ Everett, WA

Project Type: Remodel
Description: Project includes ELCCA and major renovation of entire school, including replacement of existing heating system with new hydronic heat pump loop and heat pumps.

n/a ─ size information not available or not applicable for this project
* Projects performed through other companies

_____________________________________________________________________

If You Need An Engineered Solution... We Are The Ones For You

Contact Us