Burman Design > Projects > Elementary Schools

Elementary Schools

Artondale Elementary * ─ Gig Harbor, WA

Project Type:Plumbing Remodel Design and Retrofit
Size: 51,000-ft²
Description: Project includes replacement of existing plumbing/piping systems

_____________________________________________________________________

Garfield Elementary * ─ Olympia, WA

Project Type: New Construction
Size: 48,000-ft²
Description: Project includes ELCCA, Plumbing, HVAC systems (electric furnaces) for new school. Project was part of a series of prototypes built for the district.
_____________________________________________________________________

Centennial* – Olympia, WA

Project Type: New Construction
Size: 48,000-ft²
Description: Project includes ELCCA, Plumbing, HVAC systems (electric furnaces) for new school. Project was part of a series of prototypes built for the district.
_____________________________________________________________________

Discovery* ─ Gig Harbor, WA

Project Type: HVAC and controls upgrades
Size: 50,000- ft²
Description: Project includes replacement of existing HVAC equipment and controls
_____________________________________________________________________

Foothills Elementary* ─ White River, WA

Project Type: New construction
Size: 52,000-ft²
Description: Project includes ELCCA, Plumbing, HVAC systems (central air handlers with zone duct heaters) for new school.

_____________________________________________________________________

Bonney Lake Elementary* ─ Bonney Lake, WA

Project Type: Remodel
Size: 42,000-ft²
Description: Project includes ELCCA and complete renovation of existing elementary school, replacement of HVAC and plumbing systems including kitchen

_____________________________________________________________________

Boston Harbor Elementary* ─Olympia, WA

Project Type: New Construction
Size: 45,000-ft²
Description: Project includes ELCCA, Plumbing, HVAC systems (propane gas furnaces) for new school.

_____________________________________________________________________

Project Type: New construction

Size: 48,000-ft²
Description: Project includes ELCCA, Plumbing, HVAC systems (electric furnaces) for new school. Project was part of a series of prototypes built for the district.
_____________________________________________________________________

East Olympia* ─ Olympia, WA

Project Type: New construction
Size: 48,000-ft²
Description: Project includes ELCCA, Plumbing, HVAC systems (electric furnaces) for new school. Project was part of a series of prototypes built for the district.

_____________________________________________________________________

Roosevelt Elementary* ─ Olympia, WA

Project Type: Remodel
Size: 48,000-ft²
Description: Project includes ELCCA, Plumbing, HVAC systems (electric furnaces) for remodeled school. Project was part of a series of prototypes built for the district, prototype design was adapted for use with existing school building.

_____________________________________________________________________

South Bay Elementary* ─ Lacey, WA

Project Type: Remodel and HVAC upgrade
Size: 40,000-ft²
Description: Project includes ELCCA and remodel of existing school, plumbing upgrades and HVAC replacement, split system heat pumps in classroom wing, packaged rooftop units at central/common areas.

_____________________________________________________________________

Snoqualmie Elementary* ─ Snoqualmie, WA

Project Type: Remodel, HVAC and Plumbing replacement
Size: 46,000-ft²
Description: Project includes ELCCA and complete remodel and replacement of existing plumbing and mechanical systems. Unit ventilators were replaced with two pipe hydronic heating system throughout and DX cooling provided at library and administration. New air handling units were placed on existing roof and new roof overbuild constructed to provide mechanical platform and maintenance path.

_____________________________________________________________________

Coulee City* ─ Coulee City, WA

Project Type: Remodel and HVAC replacement
Size: 22,000-ft²
Description: Project includes ELCCA and remodel of school with split system air to air heat pumps, complete new plumbing in roof overbuild, all electric.

_____________________________________________________________________

Alice V Hedden Elementary* ─ Fife, W

Project Type: New Construction
Size: 50,000-ft²
Description: Project includes ELCCA and new plumbing and HVAC system (four pipe fan coils, gas fired boilers and air cooled chiller). Administration areas provided with addition hydronic coils for enhanced thermostat control. Air handling units located on platforms in attic walkway above corridors.

_____________________________________________________________________

Rochester Primary* ─ Rochester, WA

Project Type: New construction
Size: 49,000-ft²
Description: Project includes ELCCA and new plumbing and HVAC system (four pipe fan coils, gas fired boilers and air cooled chiller) Air handling units located on platforms in attic walkway above corridors.

_____________________________________________________________________

Grand Mound Elementary* ─ Rochester, WA

Project Type: Remodel
Size: 41,000- ft²
Description: Project includes ELCCA and remodel and addition of school with four pipe hydronic fan coil system, gas fired boilers and air cooled chiller. Boilers were located in separate boiler house with piping run in utility trenches between buildings.

_____________________________________________________________________

Evergreen Elementary* ─ Shelton, WA

Project Type: New Construction
Size: 49,000-ft²
Description: Project includes ELCCA and new elementary school. Design includes four pipe fan coils, gas fired boilers and air cooled chiller.

_____________________________________________________________________

Bordeaux Elementary School* ─ Shelton, WA

Project Type: Remodel and HVAC replacement
Size: 46,500-ft²
Description: Project includes ELCCA and remodel of existing elementary school. Unit ventilators replaced by new hydronic heat pumps located in new roof overbuild, gas fired boilers and cooling tower.

_____________________________________________________________________

Mountain View Elementary* ─ Shelton, WA

Project Type: Remodel
Size: 56,135-ft²
Description: Project includes ELCCA and remodel of 51,368 square feet with 4767 sq ft addition.

Queets Clearwater* ─ Queets, WA
Project Type: HVAC upgrade
Description: Existing unit ventilators were replaced with new, quieter units. Gym air handlers replaced with more energy efficient unit.

_____________________________________________________________________

Kennydale Elementary* ─ Renton, WA

Project Type: New construction
Size: 50,000-ft²
Description: Project includes ELCCA and new plumbing and HVAC system (four pipe fan coils, gas fired boilers and air cooled chiller). Administration areas provided with addition hydronic coils for enhanced thermostat control. Air handling units located on platforms in attic walkway above corridors.

_____________________________________________________________________

Buena Vista Elementary ─ Auburn, WA

Project Type: New Addition
Description: Project includes new gymnasium, restrooms and two classroom addition.

_____________________________________________________________________

Beverly Elementary* — Edmonds, WA

Project Type: Plumbing retrofit
Description: Project includes replacement of existing plumbing systems with new.

_____________________________________________________________________

Spruce Elementary* — Edmonds, WA

Project Type: Plumbing retrofit
Description: Project includes replacement of existing plumbing systems with new.

_____________________________________________________________________

Project Type: Plumbing retrofit

Description: Project includes replacement of existing plumbing systems with new.
_____________________________________________________________________

Kirkland Children’s School – Kirkland, WA

Project Type: Plumbing and HVAC for new four classroom stand alone building
Description: Project includes plumbing for restrooms and classrooms, HVAC system is VRF with dedicated outside air unit and fan coils in each classroom piped to BC controller

n/a ─ size information not available or not applicable for this project
* indicates project done previously at another firm

_____________________________________________________________________

If You Need An Engineered Solution... We Are The Ones For You

Contact Us